Its an **** if you’re affected by a CPO but I wasn’t talking about that, we have to hide, burry or bend new railway in this country so it doesn’t spoil the view, it’s insane. There is now a 10 mile twin bore tunnel in the Chilterns costing hundreds of millions of pounds that actually only needed to be half that length to go under the hills. We’ve doubled the cost, reduced the speed, increased the journey time and put up maintenance costs 10 fold so we can’t see the railway. They don’t do that in France or Spain.